RISK ASSESSMENT CARRIED OUT BY: Amanda Ganje PRODUCTION MANAGER: Amanda Ganjeh
ACTIVITY OR PROCESS: BOOKING OUT KIT AND FILMING IN A HOUSE IN MILL HILL
SHOOT DATE: 24-25/12/2010
DATE OF ASSESSMENT: 24/12/2010
LOCATION: 3 Bampton Drive
Mill Hill
NW7 2AY
A: HAZARDS | B: DEGREE OF RISK (Refer to Risk Matrix) | C: PREVENTIVE MEASURES | D: IF ACCIDENT OCCURS? | |||
Nature of hazard | Person(s) at risk (See below) | Severity | Likelihood | Risk Rating | Measures in place aimed at reducing risk to minimum level? | Further necessary measures, involving whom and by when? |
Tripping over the cables/ equipment | Cas/Cre/Fam | Minor | Possible | D | Make sure all cables and equipment are together and out of sight. | Incase of trip immediate assistance given. |
As you can see there aren't many risks found in the location making it an excellent location to film and safe for our cast and crew.
No comments:
Post a Comment